Freezing point(℃, Adapt to environmental requirements)
≤ -10
GB/T 510
Solubility
Soluble in softening water
GB/T 6324.1
Storage
Store in a cool, dry and well-ventilated place
/
EXP
1 year
/
Scope of application
This product is suitable for the anticorrosion of the top of the tower and the pipeline of the top of the tower in the oil refinery.
Method of Use
Add the product into the dosing box, dilute it 5-10 times with softened water, and add it to the top of the device tower continuously with a metering pump. The amount of the product added is 10-20ppm. New equipment or equipment after maintenance needs pre-film, pre-film period of addition is 3 times of the usual amount, the pre-film period is generally 7 to 10 days.